Looking through the arch at the southern end of Eridge Station it can be seen that new buffers have now been installed adjacent to the milepost. 02.03.2009
Looking through the arch at the southern end of Eridge Station it can be seen that new buffers have now been installed adjacent to the milepost. 02.03.2009
Spa Valley Railway - Extension to Eridge
Trains @ fotopic.net
Contractors are currently working to install services inside the refurbished Gents on the Spa Valley platform, and metal fences and a temporary access can be seen which are part of the works.  The edge of the platform had been marked out, presumably ahead of some repair work. 02.03.2009Previous | NextLooking down from the road bridge outside Eridge Station it can be seen that the Spa Valley track has been angled slightly to the left as an additional safety measure. 02.03.2009

Rate this photo!
110
Current rating: 0.0 (0 votes)
Added on 15th March 2009, has been viewed 232 times
(232 this year, 8 this month, 2 this week, 1 today)
 

The photographs on this website are low resolution images.  If you wish to use a high resolution copy of this picture please contact me at:

trains@ntlworld.com

Click here to return to the main site Index page

 

Google